Evidence Grading Method · v1 · November 23, 2026

How a figure earns
its evidence grade

Every cash ROI figure in Roiva carries a letter beside it, A to D: its evidence grade. The letter says how much of the approved value behind the figure rests on the account's own systems, and how much on people's estimates, people's say-so, Roiva's conventions or nothing at all. Freed capacity gets a letter of its own. This page sets out every rule that produces the letter, with its numbers.

← All published methodologies

Dollars first, the letter second

The evidence grade starts with the value split by what it rests on, in dollars: "$1.2M cash: 58% measured from systems, 30% estimated by named people, 8% stated by a person, 4% assumed." The letter is read off that mix, then held down by caps for things the mix can't show, such as value approved by the person who prepared it.

It is a management and preparation signal. It tells a finance team where its AI value figures are strong, and what to do about the weak ones, before a board, a lender, a buyer or an auditor asks. Roiva's software computes it from the account's own records, so it is not independent of the company or of Roiva.

The grade reads only what the record shows: where each figure came from, who approved it, and under what controls. It never reads a preparer's own opinion of their figure, so nobody grades their own number.

Five tiers of evidence

Every approved value entry lands in exactly one tier, from the weakest figure it was worked out from. The shares of dollars in each tier are what the grade shows first.

Tier In a split What lands here
Measured measured from systems Every figure it rests on was recorded by a connected system, a warehouse query or the books, timed in a time study, or worked out against a comparison group from the account's own systems.
Estimated by named people estimated by named people Its weakest figure is a structured estimate: two or more named people, each giving a range and what it rests on.
Stated by a person stated by a person Its weakest figure is one a named person entered or set: a typed reading, the account's own minutes per unit or share credited, or a typed entry with a supporting document attached.
Assumed assumed Its weakest figure is Roiva's convention or Roiva's estimate, a figure published outside the company standing in for this company's work (a study's minutes per task), or people's survey of their own time.
No source with no source A figure a person typed, imported, had an assistant draft, or typed over, with no formula behind it and no document attached.
How an entry's tier is found

Each figure an entry was priced on is classified, and the weakest decides, so a figure is only as well evidenced as the least-evidenced thing it was computed from. A count or reading is measured when a connected system or a time study recorded it, or when Roiva averaged it from months the account's systems recorded; stated when a person typed or imported it; assumed when it is Roiva's own estimate. A baseline measured before go-live, or reconstructed after it from the account's systems, is measured. Minutes and hours are read by what they rest on:

A time figure that is… Tier
Recorded by a connected system or a warehouse query Measured
Worked out from people given the tool against people without it, in the account's own systems Measured
The same with no comparison group, shown as "measured, no comparison group" Measured
Timed in a time study Measured
A structured estimate by named people Estimated by named people
Entered or set by a named person, from their records or judgment Stated by a person
Published elsewhere, such as a study's minutes per task Assumed
Roiva's starting figure or estimate Assumed
People's survey of their own time Assumed
  • No source wins over everything else. A figure a person typed with no document attached has no source, whatever else the entry read.
  • A figure an outside AI drafted and a person accepted is the person's: stated.
  • One person marking a typed figure as an estimate makes it stated, not estimated by named people. That tier needs the structured process: more than one named estimator, each a range.
  • Capacity realized as cash rests on the capacity it came from. The cash takes the capacity's tiers in proportion, to the cent.
  • An approved entry keeps the tier it was approved on. Connecting a system improves the months it measures; it doesn't rewrite approved months. Two exceptions, outside a locked month: when a person saves Roiva's estimated baseline as their own, the entries that read it move from assumed to stated, because nothing rests on Roiva's guess any more; and when the only document a typed figure cited is removed, it has no source.

Rates and prices: whose figure

A rate, a price per unit or a contribution margin prices a figure; it isn't the figure. It is read by whose it is, and the grade shows the split as a line of its own: "Rates: 71% your own, 26% published public sources, 3% Roiva conventions."

Whose rate Effect on the tier
The account's own None
A published public source, such as the Bureau of Labor Statistics' employer costs for employee compensation None
A Roiva convention with no published source Assumed
No rate read: the entry priced nothing per unit None

A published rate doesn't lower the tier because a loaded hourly cost from a public source prices an hour fairly; what matters most is how many hours, and those are graded as time figures. "Published public sources" never means figures from other Roiva accounts: Roiva publishes no peer benchmarks.

From the mix to a letter

Shares are of the dollars on one side, cash or freed capacity, in the figure's span. Each entry weighs its absolute amount, so a month that went the wrong way counts as evidence, not as a negative share. Every share on this page, in the split, the letters and the caps, is of those absolute dollars.

Letter Measured (M) M + named estimates (E) M + E + stated (S) No source (N) In words
A ≥ 70% ≥ 90% — ≤ 1% Mostly measured, the rest estimated by named people, nothing unsourced.
B — ≥ 60% ≥ 85% ≤ 5% Mostly measured or estimated by named people; little rests on Roiva or on nothing.
C — — ≥ 50% ≤ 20% At least half rests on the account's own figures.
D Anything else Mostly assumed, or a lot with no source.

Every condition in a row must hold. The letter is the first row whose conditions the mix meets, so a mix that meets A's is A. There are four letters and no others: no pluses, no minuses.

Caps: what holds a letter down

Some weaknesses don't show in what a figure rests on, but in how it was approved and when. A cap holds the letter at a ceiling whatever the mix. Each is a share of the same side's dollars, and where two apply, the lower ceiling wins and both are listed.

Cap Share Ceiling
Approved by the auto-approve setting, not a person More than 1% B
More than 25% C
Approved by the person who prepared it More than 1% B
More than 25% C
Approved under no signed measurement charter More than 10% B
Approved with a required sign-off waived, or before a sign-off now required applied More than 10% B
A person's figure first recorded more than 90 days after its period More than 25% B
Resting on an out-of-date figure: a carried-forward reading, a time study past its re-study date, a lapsed estimate or an old baseline More than 25% B
One initiative's only: its ROI leaves out what it cost to build More than 1% B
The cash letter's only: cost dollars typed rather than booked from a connection or a bill (see Step 6) More than 50% B

"More than 1%" is how the method says "any", so a rounding cent doesn't cap. Every cap that applies is said in one line with its dollars: "Held at C: $310,000 of cash (26%) was approved by the auto-approve setting, not a person."

What A therefore means: mostly measured, approved by people who didn't prepare it, under a signed charter, current, with costs from connected sources. That is the bar a reader outside the company would want, which is the point.

One initiative, and the whole account

  • One initiative: the mix and caps over that initiative's entries in the span.
  • The account: the mix and caps over all the account's entries in the span, weighted by dollars and computed once. Never an average or a median of initiatives' letters: one initiative with $5,000 graded D doesn't drag a $2M portfolio down, while a D initiative holding most of the dollars does.
  • The span is the figure's own. A quarter's figure has the quarter's grade; a three-year figure has the three-year grade.
  • Cash and freed capacity are graded apart, as they are counted apart. ROI is cash only, so the letter beside ROI grades cash and the costs under it.
  • Dollars the totals leave out are left out of the grade too, such as an entry in another currency whose exchange rate isn't published yet. Sample data is in no grade, as it is in no total.

No grade is not D.

An initiative or side with no approved value has no letter, and says so in words: "No grade yet." It is left out of the account's letter, though its costs still count in the ROI and in the cost split.

Costs: the other half of ROI

ROI is cash value minus cost, divided by cost. An understated cost flatters ROI as surely as an overstated value, so the grade beside ROI reads what the costs rest on too.

Cost What lands here
From a connection Synced from the books, an AI provider's billing or usage, or an allocation rule over booked spend.
From a bill Booked from a bill or receipt Roiva read and a person confirmed.
Typed Entered by hand, imported, drafted by an assistant, or a typed recurring cost.

The cash letter is held at B when more than half the cost dollars in the span are typed, and the grade shows the split as a line of its own: "Costs: $410,000, 82% from connections, 18% typed." One letter covers the cash side: beside cash value, net cash value and cash ROI it is the same letter, this cap included.

Two grades, worked through

Roiva's own freed capacity: D

Roiva measures its own AI initiatives in Roiva. As of November 23, 2026, over all time, 97.5% of its approved freed capacity is a coding assistant's hours resting on people's survey of their own time, and the rest rests on Roiva's own starting figure.

  • Both are assumed figures, so none of it is measured, estimated by named people or stated: M + E + S = 0%, short of C's 50%.
  • Freed capacity: evidence grade D.

The step that moves it: measure coding throughput against a comparison group from GitHub, which moves the coding assistant's hours from assumed to measured as new months are measured. Months already approved keep what they were approved on.

An account's cash: B

Illustrative figures, not a real account's.

Cash value of $1.2M over the last 12 months:

Tier Dollars Share
Measured $696,000 58%
Estimated by named people $360,000 30%
Stated by a person $96,000 8%
Assumed $48,000 4%
No source $0 0%
  • M = 58%, short of A's 70%.
  • M + E = 88% (at least 60%), M + E + S = 96% (at least 85%), N = 0% (at most 5%): B.
  • No cap applies: every entry was approved by a person who didn't prepare it, under a signed charter, and 91% of the costs come from connections.
  • Shown as "Cash ROI 212% · Evidence grade B", with "$1.2M cash: 58% measured from systems, 30% estimated by named people, 8% stated by a person, 4% assumed."

The steps that move it, each with the dollars it moves:

  • Time the invoice-matching minutes in a time study: moves $180,000 from estimated by named people to measured. M would be 73%, but M + E stays 88%: still B.
  • Replace Roiva's 10-minute deflection convention with the account's own figure: moves $48,000 from assumed to stated. Still B.
  • Time the contract-review minutes: moves $36,000 from stated to measured. Still B on its own.
  • The first and third together: M = 76%, M + E = 91%, N = 0%: A.

Fixing a gap doesn't rewrite the past

A grade is read off what each approved entry was priced on, so the dollars a step moves are what the same value would be graded once the weak figure is replaced, not a promise that past months change:

  • Months not yet approved recalculate on the new figure and move at once.
  • Approved months keep what they were approved on. They move only if someone sends them back, a request to reopen a locked month is approved, or one of the two exceptions in Step 1 applies: Roiva's estimated baseline saved as a person's own, or a cited document removed.
  • New months are measured from the connection on.

So each step says it plainly: "moves $240,000: $60,000 waiting on approval now, the rest as new months are measured." Roiva never recalculates an approved month's dollars on its own.

What an evidence grade is not

An evidence grade describes what the approved figures in this account rest on, as recorded in Roiva. Roiva's software computed it from the account's own records; no one examined or tested those records. It is not an audit, assurance, rating or opinion on the figures.

  • Not an audit or assurance. Roiva is not a CPA firm. An evidence grade is not an audit, review, examination, agreed-upon procedures engagement or any other attestation or assurance service, and it is not performed under AICPA, PCAOB or IAASB standards.
  • Not independent. Roiva's software computes the grade from records the account's own people entered, connected or approved. Roiva does not check those records against their sources. A grade is only as accurate as the records behind it.
  • Not a rating or advice. An evidence grade is not a credit rating, not an opinion on a company, its securities or its creditworthiness, and not investment, accounting, tax or legal advice. It is separate from the Roiva Verified AI Rating.
  • Not a finding that the value is real. The grade describes the kind of evidence behind a figure, not whether the figure is correct or whether AI caused it. A figure graded A can be wrong; a figure graded D can be right.
  • Not support for financial statements. Don't use a grade as support for amounts in financial statements, adjusted EBITDA, add-backs or other non-GAAP measures without your own diligence.
  • No reliance by others. Roiva provides the grade to its customer under their agreement. Anyone else who reads a shared grade, such as a lender, buyer, investor or board member, has no agreement with Roiva, and Roiva accepts no duty or liability to them.
  • It can change. Each grade states its method version and the date it was computed. It reflects the records on that date and changes when they change, for example when an approved entry is sent back.
  • If you share your grade, the statement is yours. Include the method version, the date, this notice and a link to this page, and don't say Roiva rated, verified or endorsed your figures.

Using the criteria, and the name

The criteria on this page (the tiers, the rules that place an entry in one, the letter thresholds, the caps, the roll-up and the cost rule) are licensed under CC BY 4.0. The license covers the criteria, not Roiva's name or logo.

Using the criteria. You may use, adapt and share these criteria under CC BY 4.0. If you grade figures with them, adapted or not, say "Graded using criteria from the Roiva Evidence Grading Method v1 (CC BY 4.0)", with the version you used, and say what you changed.

Using the name. Only a grade that Roiva's software computed from an account's records, under a published version of this method, may be called a "Roiva evidence grade" or shown with Roiva's name or logo. Don't call a grade you computed yourself a Roiva evidence grade, and don't suggest that Roiva computed, reviewed or endorses it.

How we change it

Every evidence grade names the method's version beside it, in the app, in every report and export, and through the API, and each version is dated in the changelog below, so a file forwarded a year from now can be matched to the criteria that produced its letter. The thresholds, the caps and the tier rules change only in a new version, with a dated entry below. A report produced under v1 keeps saying v1.

The tiers read what Roiva's measurement methodology records about each figure (v17 today). A change there is a change to this method only if it moves a tier, and every grade names both versions: "Evidence Grading Method v1, read with measurement methodology v17."

v1 — November 23, 2026
  • The first version: five tiers (measured, estimated by named people, stated by a person, assumed, no source), the letter thresholds, eight caps, the cost rule and the roll-up set out above.

See your own evidence grade

Every plan shows it, the free one included, with the steps that would raise it, ranked by the dollars each one moves.